Endurance Foundation
50 minutes of steady endurance work at 70% FTP to build your aerobic base.
EnduranceDuration 1:00:00 Stress Points 46 Stars 1 Completions 0 by
Sven
Endurance Foundation
50 minutes of steady endurance work at 70% FTP to build your aerobic base.
Description
Build your aerobic base with this classic steady-state endurance workout. After a gradual warm-up, settle into 50 minutes of consistent effort at 70% FTP to develop your endurance engine. This foundational session will strengthen your aerobic capacity and prepare you for more intense training ahead.
Share this workout
Vekolo is a platform for creating and sharing cycling workouts. Share this workout through email or any other messaging app by copying the link below.
Viewing as Guest
Power values shown using 200w FTP. Sign in to use your personal FTP settings.
PlanShow absolute power
Warm up
- 50:00140w90rpm
Cool down
Power Zones
Recovery
4:30
7.5%
Endurance
55:30
92.5%